Most new homes, townhouses and renovations are cleaned in stages rather than in one visit. The reason is simple: a site gets dirty again every time a trade comes through. Cleaning once at the end means fighting weeks of dust in one go; cleaning at the right moments means each clean has a clear job.

Builders and site supervisors use different names for the stages. On our quotes they are Stage 1, the initial builders clean, Stage 2, the detail clean or re-clean, and Stage 3, the final sparkle or handover clean.

Stage 1 — the initial builders clean

When: after the main trades, before the finishing trades start.

The first clean clears the site so painters, tilers, cabinet makers and fit-off trades can work, and so the later cleans start from a clean base. It concentrates on what is loose and accessible:

  • agreed light debris, offcuts and packaging collected
  • protective film and coverings removed where the builder agrees
  • dust taken off accessible surfaces, sills and frames
  • floors vacuumed and given a basic clean
  • a first clean of any kitchen or bathroom that is already finished

Heavy construction waste, hazardous materials and specialist dust remediation are a different kind of work. They are assessed separately, and some of it is not cleaning work at all.

Stage 2 — the detail clean or re-clean

When: after painting, silicone, tiling and installations are finished.

This is the most thorough of the three. Joinery, fittings and finishes are now in place, so everything can be cleaned properly:

  • kitchens and bathrooms detailed
  • cupboards and drawers cleaned inside and out, wardrobes too
  • window tracks vacuumed and wiped, accessible glass cleaned
  • doors, frames and skirting boards wiped
  • light paint, adhesive and silicone residue removed where that is safe for the surface
  • tile and grout detailing where it suits the finish
  • floors cleaned the way the floor type needs

The surface decides the method. Stone benchtops, matte tiles, oiled timber and black tapware all need different products. Residue that cannot be removed without risking the finish should be noted for the builder, not forced.

Stage 3 — the final sparkle or handover clean

When: close to handover, once the disruptive trades have finished.

The last clean is about presentation: the inspection, the photographer, the client walk-through and the keys. It removes the dust that has settled since Stage 2, and the marks people leave:

  • settled dust removed from every accessible surface
  • mirrors and accessible glass polished
  • fingerprints and light marks removed
  • kitchen and bathroom surfaces presentation-cleaned
  • final floor clean
  • entrance and agreed outside areas lightly cleaned
  • a final checklist and completion photos for the builder's file

Timing matters more here than anywhere else. If a trade returns after the sparkle clean, the dust comes back too. When that happens, a short re-clean of the affected areas is better than repeating the whole stage.

Do you need all three?

Often not. Three stages suit a new home or a townhouse site where several finishing trades follow each other. Many jobs need less:

The jobUsually enough
New home or townhouse site, several finishing tradesAll three stages
Home almost finished, only final trades leftStage 2, then Stage 3
Kitchen or bathroom renovationStage 2 (one thorough clean after the trades)
Ready for photos or a display home openingStage 3
Trades came back to fix defectsA re-clean of the affected areas

When you are not sure, describe the stage the site is at and the dates you have in mind. A good cleaner will tell you which stages are worth paying for and which are not.

Guides for different kinds of project

The stages apply differently depending on what is being built:

For the handover itself, see hiring a builders cleaner: questions, timing and rubbish and checking a builders clean before handover.

Booking and quoting stages

Because each stage happens at a different time, each one should be quoted and booked on its own — even when you take all three. That way you can book Stage 1 now, and confirm Stage 3 once the handover date is firm.

On our builders cleaning page you can tick one, two or all three stages and add plans or photos. Every builders clean is a custom quote, itemised per stage.

Talk to us about your site

See exactly what our builders cleaning includes, or go straight to the next step.

Or call 0466 699 276 · WhatsApp us