A commercial fit-out ends with a hard deadline: staff start on Monday, or the shop opens on Saturday. The final clean is the last job before that, squeezed between the fit-out contractor finishing and furniture, IT and stock arriving. Planning it early keeps it from becoming the bottleneck.
What a fit-out final clean covers
- Floors: carpet tiles vacuumed, hard floors cleaned to suit the finish
- Glass: internal partitions, glass doors and shopfront glass within safe reach
- Joinery: reception counters, kitchenettes and storage, inside and out
- Kitchenettes and bathrooms: fixtures, tiles, appliances, labels removed
- Dust: on sills, skirting, door frames, switches and accessible light fittings
- Labels, film and adhesive on new fixtures and fittings
Timing it around the other trades
- Fit-out contractor finishes and removes waste.
- Final clean — ideally before furniture, so floors and corners are clear.
- Furniture and IT installation — these create packaging and dust too.
- Touch-up clean of floors and surfaces just before opening.
Many fit-outs need both a main clean and a short touch-up. Agreeing both in the quote avoids a last-minute scramble.
One clean or more than one
Builders cleaning is usually described in three stages — an initial clean, a detail re-clean and a final sparkle before handover — but not every fit-out needs all three. A small office with new carpet tiles and a kitchenette may need one thorough clean and a touch-up; a larger fit-out with wet trades, new joinery and a lot of glass may need the full sequence. We quote the stages your job needs rather than assuming all of them. The three stages of builders cleaning explains each one.
Agree before the day
- Building access, loading dock and lift booking
- After-hours work if the building is occupied
- Where waste goes — see builders rubbish vs builders clean
- The building's contractor requirements, such as inductions and documents; our list of questions to ask a builders cleaner helps
Out of scope
High glazing and fittings needing a lift or harness, and specialist floor treatments, are quoted by specialists.
What to send for a quote
Fit-out cleans are quoted individually, so the more we know, the more accurate the quote:
- The floor plan or approximate floor area, and the number of levels
- Floor finishes — carpet tiles, vinyl, timber, polished concrete or tiles
- Kitchenettes, bathrooms and showers
- How much glass there is: partitions, doors and shopfront
- The date the contractor finishes, the date furniture arrives and the opening date
- Access hours, parking or loading dock, and whether the building is occupied
- Whether power, water and lighting will be on
Our list of information to send for a builders cleaning quote goes through this in more detail.
Check it before you open
Walk through the space before the furniture goes in, with the lights on and the blinds open. Look along glass partitions at an angle, run a hand along the top of skirting and joinery, and open the cupboards and drawers. Anything missed is easiest to fix while the space is still empty. See checking a builders clean before handover.
After opening day
A final clean gets the space ready; keeping it that way is a separate job. If you want regular cleaning once staff move in, our office cleaning and commercial cleaning pages explain how ongoing cleans are quoted, and the office cleaning checklist for small businesses is a useful starting point for the scope.
Getting a quote
We quote fit-out final cleans from the floor plan or a walk-through, with the main clean and any touch-up as separate lines. Send the details through our builders and commercial cleaning page. Moving out of the old premises too? See commercial end of lease cleaning.
Talk to us about your site
See exactly what our builders cleaning includes, or go straight to the next step.
Or call 0466 699 276 · WhatsApp us